Version 019-20180216: 

New packages for validation R2.0.9.S03 and R2.0.8.S04, working with updated namespaces URI.

Updated rules for XML R2.0.9.S03:

R006 [technical update]: Check that the XML notice contains only authorized Unicode characters.
R103 [update]: The year in NO_DOC_EXT and the year in DATE_DISPATCH_NOTICE should be the same.
R105 [technical update]: The email pattern requires only one @ character and accepts all characters except the punctuation signs (comma, semicolon), the separator, non-Latin and  and non-word characters (maximal string length is 200 char).
R117 [new]: Presence of CPV code(s) inconsistent with the contract type: supplies corresponds to CPV code(s) starting from 0 to 44, Works with 45, Services from 48 to 98.
R118 [new]: Wrong value of the legal basis according to the given form.
R119 [new]: The agreement to the publication of information is required only in case of a notice covered by Directive 2014/25/EU. 
R120 [new]: The expected date of publication is foreseen only for the DEVCO forms.
R251 [Removed, replaced by R103]
R335 [technical update]: S2-02-05: Award criteria is not foreseen if prior information notice only.
R336 [technical update]: S2-02-05: Award criteria is not foreseen if periodic indicative notice only.
R337 [technical update]: S2-02-05: Award criteria: bad use of criteria according to the given directive.
R349 [new] :S2-02-07: Duration of the concession: mandatory if this concession/lot has been awarded.
R373 [technical update]: S2-02-05: Award criteria: the weighting of the price is not foreseen if Quality criterion has not been checked.
R377 [update]: S2-02-01: Lot No: must be unique within a form.
R378 [new]: S2-01-06: Maximum number of lots cannot be higher than the total number of lots (S2-02).
R379 [Removed, replaced by R119]
R379 [new]: S2-04: Essential assets: mandatory.
R380 [new]: S2-01-06: Maximum number of lots that may be awarded to one tenderer cannot be higher than Maximum number of lots or the total number of lots (S2-02).
R381 [new]: S1-04-00: Type of the contracting authority: not consistent with the given legal basis.
R382 [new]: S2-02-13: Information about European Union funds: if affirmative, the identification of the project is mandatory.
R383 [new]: S2-04: Essential assets: in case of the extended contract duration, the description of the assets is mandatory.
R384 [new]: S2-02-03: Main site or place of performance is mandatory.
R385 [new]: S2-01-03: Area(s) covered by the Public Transport Service: the selected area is not foreseen for the T02 form.
R408 [new]: S3-02-01: Information about a particular profession: if affirmative, indicate the profession.
R409 [new]: S3-01-01: Cost parameters for compensation payments: mandatory.
R410 [new]: S3-01-02: Specification of exclusive right granted: mandatory.
R411 [new]: S3-01-05: Public Service Obligations: mandatory.
R412 [new]: S3-02-01: Description: at least, one quality target must be selected.
R413 [new]: S3-02-01: Description of the quality target : mandatory if selected.
R414 [new]: S3-02-02: Information on rewards and penalties: mandatory.
R560 [new]: S4-02-01: Previous publication: mandatory except in case of Award of a contract without prior publication.
R561 [new]: S4: Procedure: mandatory.
R610 [technical update]: S5: Award of the contract (concession): at most one award per contrat/concession/lot is allowed if the procedure is not an innovation partnership and if there is neither a framework agreement nor a dynamic purchasing system.
R611 [Removed, replaced by R119]
R611 [new]: S5: Award of the contract (concession): at most one award per contrat/concession/lot is allowed if the procedure is not an innovation partnership and if there is neither a framework agreement nor a dynamic purchasing system nor a previous publication.
R997 [new]: information (resp. xml element) not foreseen for the given form. 
R999 [technical update]: Text size limit exceeded.